We are very pleased to congratulate Heritage Oil and Genel Energy for a win-win deal on the Miran Field in Kurdistan. EPConsult Energies is proud to have prepared the following documentation for the Miran Field:Field Development PlanPipeline Conceptual Design - Kurdistan International Gas Export Pipeline (KIGE)CAPEX/OPEX Estimate for the Early Development SchemeBOOT Contractual Documentation 
EPConsult Energies has attended the conference on POWER PLANT FLEXIBILITY, EUROPE 2013 on 13-15 March 2013 in Vienna, Austria. Managing Director of EPConsult Energies, Martin Larsen facilitated a Half-Day Interactive Users’ Workshop on "Through-Life Performance Optimisation of Power Plants" The top power plant companies such as DONG Energy, ALSTOM, GE Energy, Centrica and SIEMENS participated in the workshop. …
EPConsult Energies (EPEn) has been commissioned by ZADCO (Zakum Development Company), and the National Petroleum Construction Company (NPCC) and Technip France Abu Dhabi Consortium to conduct the Reliability and Operability Studies for the EPC stage of the Satah Full Field Development (STFFD) project. The scope comprises offshore production, onshore process facilities, and their associated utilities; and is located approximately 200 km North-…
Stine subsea well SCB-1, located in the Siri Fairway in the Danish North Sea, was scheduled to be worked over in April 2012, to correct a malfunctioning subsurface safety valve.Prior to the planned workover, EPConsult Energies were engaged to conduct a 'return to production' readiness review to assess whether there were any other issues which might prevent resumption of full production from the well. The review confirmed the requirement to…
The Miran oil and gas fields are located in the Miran Block near Suleimaniah in the Kurdistan region of Iraq. Heritage Energy Middle East, subsidiary of Heritage Oil PLC, has engaged EPConsult Energies to prepare the Field Development Plan  for the Miran Field Early Production Scheme and Full Field Development for Miran West and East.  The engagement also involves supporting Heritage with CAPEX estimation, ITT development and EIA scope…
EPConsult Energies has been contracted via the detail design contractor, JPKenny, to perform a QRA (Quantitative Risk Assessment) for the Shah Deniz Phase 2 pipelines in the nearshore section of Sangachal Bay.  The scope of the risk assessment covered interactions between vessels sailing in Sangachal Bay and the pipelines including sinking, grounding, anchor dragging and dropped objects.
EPConsult Energies have been commissioned by Petroleum Authority of Thailand Exploration and Production International Limited (PTTEPI) / Larsen & Toubro Valdel Engineering (LTV) to conduct a series of Detailed Design Safety, Risk and Reliability Studies to support the PTTEPI Zawtika Development. The scope includes: Reliability Engineering (RAM); 3D F&G Mapping; CFD Explosion Modelling; Noise & Vibration Analysis; QRA; FERA;…
EPConsult Energies has chaired a presentation workshop on the subject of Enterprise Risk Management (ERM) to a group of Oil and Gas Executives. The workshop was focused at how ERM can support an oil company in Driving Operational Growth.  The agenda involved processes and techniques, establishing an innovative culture, empowering employees, support in strategic decision making. Why invest in ERM? “Because it’s good business…
Managing Director, Martin Larsen, was invited to the Danish Embassy in the UK to deliver presentation to a delegation of Danish business people from Esbjerg region - the main offshore hub in Denmark. The main purpose of this presentation was to provide an overview of the UK offshore sector.If you wish to discuss this topic, please don't hesitate to contact us on enquiries@ep-consult.co.uk.
A Gap Analysis has been completed by EPConsult Energies of the COMAH Report and associated studies of the Offshore Facilities and Mussafah Warehouse Project for the Bunduq Oil Company. The gap analysis was performed against the Principal Requirements of ADNOC COPV5-01 Control of Major Accident Hazards (COMAH), Version 1, 09.05.2004.The impact of ADNOC Code of Practice on Safe Handling and Working with Hydrogen Sulphide, ADNOC-COPV4-10, on the…